The Righter Company is modifying the overflows at eight water tanks to comply with EPA guidelines. Our work consists of cutting a hole in the side of each tank, modifying the overflow pipe to allow the pipe to drain on the outside of the tank, and improving the drainage at the outflow. The crew consists of Shawn Ison, Josh Priest and James Talbert, and they are doing a great job! The Supervisor is Tom Ison and the Project Manager is Nick Miller. Righter commenced work in May and anticipates completion at the end of January 2020.