May 29, 2020

Zollinger Road Tank Altitude Valve

Righter mobilized to the Zollinger Road Tank Altitude Valve project earlier in the month.  The owner on this project is The City of Upper Arlington.  The project is being led by Marvin Kemmerer (Field Supervisor) in the field and Chris Thompson (Project Manager) in the office.  Vince Gaus and Brandon Lowery are members of Righter’s field crew working at this location.  The project consists of the replacement of existing valves, pipe and fittings, structural concrete slab replacement and related site work.  Righter anticipates finishing the project in August of 2020. The picture shows the vault top slab removal.  Righter’s subcontractor, Donley Concrete Cutting, is performing the concrete sawcutting.