News

February 29, 2024

O.P. Chaney Grain Elevator

PROJECT COMPLETION: O.P. CHANEY GRAIN ELEVATOR

The historic grain elevator in Canal Winchester, OH recently finished up the roofing portion of work. The previous roof was installed in the 1960’s and needed a replacement. Righter Company teamed up with Accurate Roofing, Inc. to give the building a new standing seam metal roof. Brandon Lowery is the project foreman and Jacobi Schmalenberger is the project manager. Summer ’23.

News
February 29, 2024

Gallia County

PROJECT UPDATE: GALLIA COUNTY

The first phase of the deck pour has been completed. The crew for the bridge consists of Foreman – Jeff McGuire, Butch Sullivan, Ben Sullivan, Jeremy McGuire, Brenton McGuire, Lee Sullivan, Jordan Sullivan, JC Durham, and Robert Ward. Stay tuned for more updates! Summer ’23.

News
February 29, 2024

https://fb.watch/qwhbcpMsEi/

The Righter Company’s Mark Litter (Project Foreman) captured some footage of Operator, Justin Adams, driving piling for the falsework of the bridge. In the video you can see laborers, Pete Litter and Matt Mitchell, as well as Dannie Wilson, operating in the background. Summer ’23.

News
February 29, 2024

Turnberry Golf Course – Emergency Bridge Repairs

PROJECT: TURNBERRY GOLF COURSE – EMERGENCY BRIDGE REPAIRS

The Righter Company, Inc. was contacted by the City of Columbus to repair damages at Turnberry Golf Course. Their bridge that accesses the golf course had the abutments partially washed out causing the structure to shift. Work included driving piling next the existing super structure, installing a header beam at either end of the bridge, and setting the bridge on the piling. Rock channel protection was also installed for additional protection and prevent future washout. Mark Litter was the onsite foreman with help from Robert Ward, Pete Litter, Justin Adams, and Matt Mitchell. Jacobi Schmalenberger was the project manager. Summer ’23.

News
February 29, 2024

Hills Covered Bridge

PROJECT UPDATE: HILLS COVERED BRIDGE

Currently at the Hills Covered Bridge in Marietta, OH, Brandon Lowery and his crew, Clay Slevin, Dakota Lowery, and Rob Richmond, are working on the timber truss rehabilitation. 10 newly fabricated thrust blocks have been delivered to the project for incorporation into the timber truss rehabilitation. There are some additional timber truss members that have deteriorated to a condition that need to be replaced that were not previously anticipated. Progress is certainly being made and the truss rehabilitation will be completed this summer. Keep up the good work, guys! Summer ’23.

News
February 29, 2024

Urbana Booster Stations

PROJECT UPDATE: URBANA BOOSTER STATIONS

Progress is still being made for our Urbana Booster Stations project. The installation of 8″ ductile iron pipe at the Children’s Home site started last week.
Nick Miller – Project Manager, Tom Ison – Superintendent, Crew Members – Josh Priest, Brayden Ison & Shawn Ison. Summer ’23.
News
February 29, 2024

McWane Pole Casting – Helical Piers

The Righter Company was contacted to install helical piers at the McWane Ductile Facility in Coshocton, Ohio. 27 each, round shaft helical piers were installed with new construction caps to complete the project.
John Fuller was the foreman on the project with a crew consisting of Clay Slevin, Kasey McCloskey, and Bobby Sharp. Jacobi Schmalenberger was the project manager for the project. Summer ’23.
News
February 29, 2024

Gallia County

PROJECT UPDATE: ODOT 210603 – GALLIA COUNTY
The concrete patching of the bridge superstructure is ongoing. Most of the vertical patching on the through girders has been completed, with the remaining vertical patches to be completed over the next 2 weeks. The end floor beams have been removed, and the new ones will be poured in the next 2 weeks. Removal and replacement of the bridge deck will begin soon. Crew consists of Jeff McGuire, Jeremy McGuire, Brenton McGuire, Jordan Sullivan and Lee Sullivan; Project Manager, Mike Killilea. Summer ’23.
News